staff crane是什么意思 staff crane在线中文翻译

staff crane

staff crane 双语例句

  1. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
    8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
  2. When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
    8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
  3. Between 10th and 14th September 2009, staff of Xinqing Hooded Crane N. R. sighted and took pictures of Chinese vagrant bird - Sandhill Crane when carrying out crane survey in the field.
    2009年9月10-14日,新青白头鹤自然保护区科研人员在野外开展鹤类调查时,发现了一只中国罕见迷鸟—沙丘鹤,并拍摄了照片。
  4. This software has friendly man-machine interface, can achieve optimal Lift system with the fundamental arguments of bridge crane dam. and can output this optimal designed result to a text document which engineering staff can be referred to.
    本系统具有友好的人机对话界面,可以在给定起重机小车原始技术参数的条件下,以小车质量最小、小车提升重量最大为目标函数,采用最优化方法,在钢丝绳、电机、减速器的优化选择等条件下优化设计出最优的起升系统,采用参数化计算方法将优化设计结果设计数据以文本文档的格式输出,以便工程技术人员参考。
  5. Computer Training Simulator System for Operating Staff of Bridge Crane
    行车操作人员培训计算机仿真系统
  6. Company covers an area of 260 mu, with fixed assets of 120 million, of which construction area of 32, 000 square meters and large crane operating at the scene door 15, 000 square meters; the total number of 588 employees, of whom more than 63 degrees; have an independent product development design team, including technology development and design staff 27; The company currently has a professional welding, machining and heat treatment equipment, also have large-scale CNC Cutting Line, CO2 gas automatic welding line, a large shot blasting machine derusting, plate leveler machine, specialized processing machinery and other major key equipment, quality testing equipment, a total of more than 200 sets.
    公司占地面积260多亩,拥有固定资产1.2亿,其中建筑面积32000平方米和大型门吊作业现场15000平方米;职工总数588人,其中本科学历以上63人;拥有一支能独立进行产品开发设计的技术队伍,其中技术开发与设计人员27名;公司目前拥有专业铆焊、机加工和热处理装备外,同时拥有大型的数控下料线、CO2气体自动焊接线、大型抛丸除锈机、钢板矫平机、专门加工机械等重大关键设备、质量检测装备共200多台套。
  7. Operators of tower crane belong to the special operation staff, and are requested that they not only must be subjected to rigorous trainings, but must pass the examination before operating tower crane.
    塔机作业人员属于特种作业人员,必须经过严格的培训,考核合格后持证上岗。

staff crane 单语例句

  1. The lion drags the crane back towards its cage as the park staff arrives for a rescue of the crane.

staff crane

中文翻译
1
路签授受机
相关单词
staff crane

相关单词辨析

这组词都有“手杖”的意思,其区别是:
staff: 多指走路爬山时用作支持或防卫使用的长木棒。
stick: 普通用词,指木制的细长手杖。
cane: 多指用藤或竹制成的细长的手杖。