pit field是什么意思 pit field在线中文翻译

pit field

pit field 双语例句

  1. Against the wall of the pigpen a pile of manure waited to be アダルト to their family plot, Where it would go through high-レーシック composting in a pit for two months before being put into the field.
    起出的圈肥堆在猪圈冷却壁墙边,等着用车拉到自家丽江旅游地里。地头有个□□□脱皮化粪池,猪圈肥要在里面高温焐上两个月,再撒到地里。
  2. Biot`s consoildation; finite layer; nonlinear elastic; dynamic effect stress; Generlized load transfer function; pile foundation; pit foundation; settlement prediction; Possion curve; field measurements
    比奥固结;有限层;非线性弹性;动态有效应力原理;广义荷载传递函数;桩基工程;基坑工程;沉降预测;泊松曲线;现场测试
  3. In a large pit there are many steps just like terraced field, what are these steps for?
    在一个大坑的边缘,有许多像梯田那样的阶梯。它们是作什么用的?
  4. In a large pit there are many steps just like terrace d field, what are these steps for?
    在一个大坑的边缘,有许多像梯田那样的阶梯。它们是作什么用的?
  5. Longgu town mine pit: It is the first exploring mine pit in Juye coal field, the geological reserve 1, 700, 000, 000 tons, the main coal strata contain gas-making coal, 1/3 coke coal, the recoverable resources occupy 1/3 of Juye coal field, low sulfur, high volatile constituent, high heating value, high cohesiveness, high coking property and coking coal.
    龙固矿井:属巨野煤田的首采矿井,地质储量17亿吨,煤种以肥煤和1/3焦煤为主,可采储量占巨野矿区的1/3,属低硫、高挥发、高发热量、高粘结性、高结焦性优质炼焦煤。2007年10月首采工作将全面投产,2008年可产煤400万吨,2009年可产煤1200万吨。
  6. The surface mining technology system is the main technique decision about open-pit mining design. The surface coal fields are complex in seat condition, what technology is selected for a surface mine has not a reliable and received theory rest on. In this thesis, I founded a surface coal fields classifying index system basis on coal field feature and mining condition by investigating and statistics and analyzing. Digital models of the classifying index are founded; the power coefficient calculating method is eatablished. The coal fields are classified with fuzzy get-together method. And the workable technology systems are matched for any one type coal field. It is founded that are the mining technology system compatibility`s evaluating index system and the mining technology suitable for conditions model. We can evaluate a mining technology system via seting up attribution-degree calculating model about any one evaluating factor and the power coefficient. These provided theory basis for selecting the surface mining technology. The deposit models are founded in order to improve mine design quality and working efficiency, to deal fastly with abundant datum.
    露天开采工艺是露天矿开采设计中最重要的技术决定,我国露天煤田赋存条件复杂,开发一个露天矿究竟选用何种开采工艺,至今还没有一个被大家公认的可靠的理论上的依据,本文首先对我国煤田进行大量的调查、统计与分析,根据煤田的赋存特征、开采条件等建立了露天煤田分类指标体系,建立了分类指标的量化模型以及其权重系数的确定方法,采用模糊聚类法对其进行分类,并对每种类型的煤田提出可行的开采工艺,通过建立露天开采工艺系统适应性评价指标体系和各种常用露天开采工艺系统的适用条件模型,对某种可行性开采工艺的适应性,通过建立每个影响因素适应性的隶属度计算模型,再根据各个影响因素的权重系数综合得出被评价开采工艺的适应性指标,从而对开采工艺的适应性进行评价,为我国露天矿设计中的工艺选择提供指导和理论依据。
  7. Stochastic analysis was applied to the investigation of the influence of the presence of the magnetic field on the pitting mechanism of pure magnesium, in which pitting corrosion was simulated as the combination of two physical processes: pit initiation and pit growth.
    通过恒电位的方法测量了在有无磁场条件下纯镁的电流-时间响应曲线,并用随机的方法对结果进行分析,研究了磁场对纯镁点蚀产生过程和点蚀成长概率的影响。
  8. Daoxiang Pavilion is located in the world one must pit gold scenic terrace of the Dragons Back is a beautiful, tranquil environment, a professional scenic spot for tourists to provide accommodation services to traditional private hotel, located in the main scenic spots I, II, III Lookouts Center Field Walled on the head.
    稻香阁位于天下一绝的龙脊景区金坑梯田,是一座风景优美,环境幽雅的专业景区为旅游者提供食宿服务的民家酒店,位于主要景区一,二,三号观景点中心的田头寨上。
  9. The simple pit of parenchyma cell formed by CMfs of primary wall circled primary pits field and the long axis of pit were always same to the CMfs arrangement of each secondary wall.
    将纤维素微纤丝排列变化与细胞壁各层厚度的研究结果相结合,本文提出了毛竹纤维细胞壁的构成模型。
  10. Simple pit on fiber cell wall formed by CMfs of primary wall sunk on the area of primary pits field. CMfs of each secondary wall surrounded Simple pit to an oval.
    场发射和复型技术揭示纤维、基本薄壁组织细胞和导管的细胞壁上CMfs的沉积方式。
  11. This paper focuses on studies of distribution of temperature field of artificial ice wall affected by heat transfer of concrete hydration while a pit excavating and then pouring mass concrete liner when temperature field of artificial ice wall is forming.
    研究了在人工冻土墙形成并达稳定温度场分布呈非线性后,基坑开挖并浇注大体积混凝土衬砌时,混凝土水化热对人工冻土墙温度场分布的影响,分析得出了受影响区域内冻土墙被融化及重新冻结的过程。
  12. In this paper, I regard the engineering as a plane strain problem, study the internal force and distortion rule of supporting structure. The main research contains:(1)The choice of soil body model, in this article the soil body uses the expansion the Druker-Prager model, soil body unit uses CPE8R, pile and anchor unit uses B22; (2)Setting up initial geostress field, Exerts the volume stress to the soil body, this action and the soil body initial stress just right balance, causes the soil body the initial displacement is zero; (3)Infliction of pre-stress of pole, The definition pre-stressed section attribute, to needs to exert the pre-stressed the part to exert the pre-stressed, and in step maintains the corresponding pre-stressed value at the following analysis; (4)Simulation of excavate foundation pit, use the order *model change in some analysis step to remove or to increase the unit, namely unit hard work concept.
    主要研究内容包括:(1)基于ABAQUS的土体模型和单元的选取,本文中土体采用扩展的Druker-Prager模型,土体单元取8节点四边形二次平面应变减缩积分单元CPE8R,支护桩单元和锚杆采用二次梁单元B22;(2)初始地应力场建立,对土体施加体积应力,该作用力与土体的初始应力正好平衡,使得土体的初始位移为零;(3)锚杆预应力施加,定义预应力截面属性,对需要施加预应力的部分施加预应力,并在后续的分析步中保持相应的预应力值;(4)分步开挖过程模拟,需要在某一分析步骤中使用*model change命令移去或增添单元,即单元的死活概念。
  13. Technical study of vegetation reconstruction of waste soil field in haizhou open pit coal mine
    海州露天矿排土场植被重建技术研究
  14. Experimental Study of Soil Quality Improvement and Plant Instauration in Land Reclamation of Waste Soil Field in Open Pit Coal Mine
    露天矿排土场复垦中土壤改良及植被恢复的试验研究
  15. The field coupon tests indicated that the Jurassic oil well pipe in the oil field of PetroChina Changqing Oil Field Company suffered from severe internal corrosion, especially the pit corrosion.
    通过现场腐蚀挂片试验,发现中国石油天然气股份有限公司长庆油田分公司某油田开采侏罗系油井管柱遭受严重的内腐蚀,以点蚀为主要破坏形式。
  16. This study will have an important value for design on field engineering of pit irrigation under some soil and water conservation standard condition.
    此项研究对于在一定的水土流失防治标准下设计蓄水坑灌的田间工程具有重要的价值。
  17. According to the specific of pit irrigation field engineering, the characteristic of runoff producing rain and sink flow in pit irrigation were analyzed.
    根据蓄水坑灌法田间工程的特点,分析了在蓄水坑灌条件下的产汇流特性;
  18. The test analysis and field observation for deep mixing method and cast in situ piles support system of foundation pit
    水泥土-灌注桩基坑围护结构的试验与现场实测
  19. After installation, a Field Test shall be performed by the installer on each completed Dry-Pit Submersible Pump System.
    安装后,安装商应该对每台完整的干井潜水泵系统进行现场测试。
  20. After analyzed the data of the deformation information of the field-test, utilized the neural network to make prediction about the deformation of supporting structure and guaranteed the deep foundation pit safety.
    通过现场量测的深基坑围护结构变形信息资料,对实测数据进行整理和分析,利用神经网络对支护结构的变形做出预测,以保证基坑安全施工。

pit field

中文翻译
1
纹孔场
相关单词
pit field

相关单词辨析

这组词都有“洞、穴”的意思,其区别是:
hollow: 通常指表面上的坑或凹处,也指物体内部的空洞。
cavity: 比hole正式,指实体内中或表面的空洞或空腔。
pit: 指天然的大洞,尤指地上的洞,也指为采掘矿物而挖的深洞。
cave: 指出洞、窑洞或溶洞,可以是天然的或人造的。
hole: 最普通用词,泛指实体上的洞、孔或坑,不涉及其大小、深浅或穿透与否。

这组词都有“范围,领域”的意思,其区别是:
field: 主要指经选定在一段时间内作专题研究的方面或领域,含夸张意味。
territory: 指科学知识、活动等的领域或范围。
province: 即可指科学、艺术、学问的领域或范围,又可指个人或机关职权的管辖范围。
domain: 指知识艺术、兴趣或人类活动的领域。
sphere: 指有明显分界线的范围或领域,强调彼此不会干扰、跨越,各不相关。