dry excavation是什么意思 dry excavation在线中文翻译

dry excavation

dry excavation 双语例句

  1. The temporary plan shall fully identify and detail Contractor`s procedures, and means proposed for any required shoring, sheeting and bracing works; required cofferdams and platforms; and the manner and means proposed for dewatering and maintaining excavation pits dry at all times.
    临时计划要完全确认和详细说明承包人提交的程序和方法,如要求的支撑、覆盖、绑定工作;要求的围堰和平台;以及提交的关于要求挖坑去水和始终保持干燥的方式方法。
  2. Dry density of filling in different construction stage, coefficient of excavation are acquired through actual data.
    通过试验段大量现场实测资料,得出了各施工阶段填料密度数据、场地土挖填系数。
  3. A study on deformation of soil for large area and over-compensated foundation in dry-dock excavation engineering & Dry dock excavation engineering of outer Ring Tunnel Project in Pudong, Shanghai
    大面积、超补偿的干坞地基变形研究&上海外环隧道的浦东干坞开挖工程
  4. Factors influencing the deformation of a dry-dock slope were analyzed. They are soil mass strength, time of non-protection slope, gradient of slope, number of layout excavation, depth of layout excavation, excavation step, rainfall depth and load on slope top.
    分析了影响干坞边坡变形的因素,包括土体强度、无护坡时间、放坡坡率、分层开挖数、分层开挖深度、开挖步长、降水深度和坡顶荷载。
  5. Creative design of super large dry-dock head construction by means of deep steel sheet piling excavation in water area
    采用水上深基坑围护法建造特大型船坞坞口的创新设计
  6. A New Way of Evaluating Bed Coefficients of Winkler's Foundation Creative design of super large dry-dock head construction by means of deep steel sheet piling excavation in water area
    文克尔地基基床系数取值的新途径(干船坞设计规范水工结构篇附录二方法说明及建议)采用水上深基坑围护法建造特大型船坞坞口的创新设计
  7. In most cases, the face of the drill-and-blast excavation was originally fairly dry.
    在许多情况下,操练和疾风挖掘的面孔最初是相当干燥的。
  8. Construction of foundation and basement is chosen in the dry season in order to reduce the exposure time of excavation.
    基坑及地下室施工尽量选择在枯水季节,减小基坑开挖暴露的时间。
  9. Application of foundation excavation with slope in port dry excavation
    放坡开挖基坑工程在码头干地施工的应用
  10. The paper expatiates key construction technologies including bank stabilization, earth excavation, slope protection, dock drainage, base treatment and dock block construction according to the dry dock construction of Ningbo Changhong Immersed Tunnel.
    结合宁波常洪沉管隧道干坞施工,阐述了干坞大堤加固、土方开挖、边坡护坡、基坑排水、基底处理和坞墩施工等施工工艺和关键技术要点。

dry excavation

中文翻译
1
干开挖
相关单词
dry excavation