cable pole是什么意思 cable pole在线中文翻译

cable pole

cable pole 双语例句

  1. The two grown children, a boy and girl, jumped off carrying harnesses and a bamboo cable and climbed to a path on the bank. Mother stayed at the rudder, steering, while father stood on the bow with a long bamboo pole with an iron point, which he used to prevent beaching or collision.
    两个成年的孩子开始带上纤具和一条竹制缆绳爬上岸边的小路,妈妈在舵旁掌舵,爸爸拿着一根长长的带铁尖的竹槁站在船头,防止靠岸和碰撞。
  2. After input the given parameters, the main cable, wind-cable and the pole length can be calculated and outputted accurately and rapidly by four modes, and a general arrangement of the bridge can also be drawn. Flexible suspension bridge; Cable system; Catenary theory; Visual programming; Visual Basic for application
    本文在已建立设计数学模型的基础上[6],利用VisualBasic6.0实现系统设计,开发柔性吊桥计算机辅助设计系统,解决柔性吊桥悬索设计的计算机化,避免烦琐、复杂的迭代计算和桥型布置图绘制,提高设计计算精度与效率。1系统主要功能悬索计算:在给定跨距、弦倾角、矢跨
  3. By an newsperson from one of the cable networks. Visibly shaken, wide-eyed and staring off into the distance, he told thea telephone pole, and thought a person standing next to himwas crushed by a car-sized piece of concrete.
    明显地身体在颤抖,吃惊地远远凝视,想到站在他附近的一个人被汽车般大的混凝土砸个粉碎,他告诉记者他差点被一块电话筒大的金属砸中。
  4. Introduces several technologies such as overhead insulated cable、small scale iron tower and steel pipe pole to solve a difficult problem for modification of 10 kV overhead line.
    提出了采用架空绝缘电缆、特殊设计的小型铁塔和钢管杆等几种技术,解决了10kV线路改造的难题。
  5. I can't get cable, but I can get the south pole on hi-def.
    看不了有线电视却能在高清晰电视上看南极
  6. Construction of power grids; power grid infrastructure; power supply; the safe operation of power grids; States Power; the national grid; power grid construction and development; grid development planning; grid construction projects; grid development planning; power grid construction and transformation projects; grid project construction sites and Line corridor; power grid planning and construction projects; substation sites, and overhead power line corridors and cable channels; substations and overhead power line pole, tower base; grid enterprises; power construction projects; grid enterprises; power grid construction projects; grid enterprises; overhead under power lines, tower base; overhead power lines and underground electrical facilities corridor land; overhead power line pole, tower base; the basis of self-reliance tower over the exposed parts of their lateral extension of 1 m outside of the quadrilateral formed; la mast, the main tower cable pits and pit; under the tower base; the pole and overhead power lines, tower base; power grid enterprises; new corridors and overhead power lines; new corridors and overhead power lines; power grid enterprises; and overhead power lines from the higher ground; power grid enterprises; overhead line; grid enterprises; overhead power line construction and safe operation; and above 500-kilovolt line from the side below the level of lead from the scope of 5 meters; 220 kV and below line; overhead lines within the scope of 300 meters; power lines; grid enterprises; protection of power facilities; power facilities; power facilities; power grid enterprises; grid construction project planning and construction of power grids; power grid enterprises; 500 kV Substation, 220 kV substation City; power grid enterprises; power grid construction projects; power grid enterprises; power grid construction projects; grid construction projects; grid smooth implementation of construction projects; power grids, power plant equipment tender, power plants, power grids project tendering, project information to be under construction; Chen Mobile:+0086-13901623260; pool of talents, experts ring
    电网建设;电网基础设施建设;电力供应;电网安全运行;各国电力;各国家电网;电网建设和发展;电网发展规划;电网建设项目;电网发展规划;电网建设与改造项目;电网项目建设用地和线路走廊;电网规划建设项目;变电设施用地、架空电力线路走廊和电缆通道;变电站和架空电力线路的杆、塔基础;电网企业;电力建设项目;电网企业;电网建设项目;电网企业;架空电力线路的杆、塔基础;架空电力线走廊和地下电力设施用地;架空电力线路杆、塔基础;自立塔以其基础外露部分外侧向外延伸1米所形成的四边形;拉线杆、塔的主坑和拉线坑;杆、塔基础;架空电力线路的杆、塔基础;电网企业;新建架空电力线路走廊;新建架空电力线路走廊;电网企业;架空电力线路距离地面较高;电网企业;架空线路;电网企业;架空电力线路建设及安全运行;500千伏及以上线路距边导线正下方水平距离5米范围内;220千伏及以下线路;架空线路300米范围内;电力线路;电网企业;电力设施保护;电力设施;电力设施;电网企业;电网建设规划和电网建设项目;电网企业;500千伏变电站、220千伏城区变电站;电网企业;电网建设项目;电网企业;电网建设项目;电网建设项目;电网建设项目顺利实施;电网、电厂设备招标、电厂、电网工程招标、拟在建项目信息;陈氏手机:+0086-13901623260;人材库,人才库,专家圈
  7. Ireland, Estonia and Andorra Albania Austria Belarus Bosnia Bulgaria, Belgium and Iceland Russia Poland, Denmark and Germany France, Finland and Netherlands Montenegro Czech, Croatia and Latvia Liechtenstein Lithuania Luxembourg Macedonia, Romania, Moldova, Monaco and Norway Malta, Portugal, Sweden and Switzerland San Marino Serbia Slovakia, Slovenia and Ukraine Greece, Hungary and Italy Spain United Kingdom European North America Antigone melon and Barbuda, Barbados, Bahamas and Panama, Costa Rica Dominica Grenada, Cuba and Canada Jamaica Trinidad and Tobago United States of America Mexico South America Argentina Brazil, Bolivia and Colombia Ecuador, Guyana and Peru Suriname Uruguay Venezuela Oceania Australia and Australia Papua New Guinea, Chile, Fiji, Cook Islands FSM Tonga Samoa Vanuatu New Zealand亚纽埃construction of power grids; power grid infrastructure; power supply; the safe operation of power grids; States Power; the national grid; power grid construction and development; grid development planning; grid construction projects; Power Development planning; power grid construction and transformation projects; grid projects and line the corridor of land for construction purposes; power grid planning and construction projects; substation sites, and overhead power line corridors and cable channels; substations and overhead power line pole, tower base; grid enterprises; power construction projects; grid enterprises; grid construction projects; grid enterprises; the pole and overhead power lines, tower base; overhead power line corridors and underground electrical facilities sites; overhead power line pole, tower base; the basis of self-reliance for its tower extends over the exposed parts of the lateral 1 m of the quadrilateral formed; la mast, tower of the main pit and pit lines; under the tower base; the pole and overhead power lines, tower base; power grid enterprises; new corridors and overhead power lines; new corridors and overhead power lines; power grid enterprises; and overhead power lines from the higher ground; grid enterprises; overhead lines; grid enterprises; overhead power line construction and safe operation; and above 500-kilovolt line from the side below the level of lead from the scope of 5 meters; 220 kV and below line; overhead lines within the scope of 300 meters; power lines; grid enterprises; power facilities protection; power facilities; power facilities; grid enterprises; grid construction project planning and construction of power grids; power grid enterprises; 500 kV Substation, 220 kV substation City; Power Enterprise; grid construction projects; grid enterprises; grid construction projects; grid construction projects; grid smooth implementation of construction projects; power grids, power plant equipment tender, power plants, power grids project tendering, project information to be under construction; Chen Mobile:+0086-13901623260; pool of talent pool, experts ring
    阿尔巴尼亚爱尔兰爱沙尼亚安道尔奥地利白俄罗斯保加利亚比利时冰岛波黑波兰丹麦德国俄罗斯法国芬兰荷兰黑山捷克克罗地亚拉脱维亚立陶宛列支敦士登卢森堡罗马尼亚马耳他马其顿摩尔多瓦摩纳哥挪威葡萄牙瑞典瑞士塞尔维亚圣马力诺斯洛伐克斯洛文尼亚乌克兰西班牙希腊匈牙利意大利英国欧盟北美洲安提瓜和巴布达巴巴多斯巴哈马巴拿马多米尼克哥斯达黎加格林纳达古巴加拿大美国墨西哥特立尼达和多巴哥牙买加南美洲阿根廷巴西玻利维亚哥伦比亚厄瓜多尔圭亚那秘鲁苏里南委内瑞拉乌拉圭智利大洋洲澳洲澳大利亚巴布亚新几内亚斐济库克群岛密克罗尼西亚纽埃萨摩亚汤加瓦努阿图新西兰电网建设;电网基础设施建设;电力供应;电网安全运行;各国电力;各国家电网;电网建设和发展;电网发展规划;电网建设项目;电网发展规划;电网建设与改造项目;电网项目建设用地和线路走廊;电网规划建设项目;变电设施用地、架空电力线路走廊和电缆通道;变电站和架空电力线路的杆、塔基础;电网企业;电力建设项目;电网企业;电网建设项目;电网企业;架空电力线路的杆、塔基础;架空电力线走廊和地下电力设施用地;架空电力线路杆、塔基础;自立塔以其基础外露部分外侧向外延伸1米所形成的四边形;拉线杆、塔的主坑和拉线坑;杆、塔基础;架空电力线路的杆、塔基础;电网企业;新建架空电力线路走廊;新建架空电力线路走廊;电网企业;架空电力线路距离地面较高;电网企业;架空线路;电网企业;架空电力线路建设及安全运行;500千伏及以上线路距边导线正下方水平距离5米范围内;220千伏及以下线路;架空线路300米范围内;电力线路;电网企业;电力设施保护;电力设施;电力设施;电网企业;电网建设规划和电网建设项目;电网企业;500千伏变电站、220千伏城区变电站;电网企业;电网建设项目;电网企业;电网建设项目;电网建设项目;电网建设项目顺利实施;电网、电厂设备招标、电厂、电网工程招标、拟在建项目信息;陈氏手机:+0086-13901623260;人材库,人才库,专家圈
  8. The Location Calculation of the Wire Pole of 10 kV Distribution Wire of Rural Power Gird The cable is designed for aerial electricity transmission and distribution line.
    农网10kV配电线路拉线坑的定位计算本产品适用于架空电力输配电线路。
  9. Finite pole-element calculation of anchor cable anti-slide pile and study of cross sectional shape
    锚拉抗滑桩有限元计算及截面形状研究
  10. ULTRASONIC TESTING ON THE LOAD MONITORING OF PRE-STRESSED CABLE AND ITS APPLICATION Embedded Research and Design of Anchor Pole Stress Measuring Instrument
    锚索预应力声测技术研究及工程应用嵌入式锚杆检测应力仪的研究与设计
  11. Aberrance of the horizontal pattern of pole was concerned, which was caused by the mutual coupling in antenna array. During the analysis of pole pattern, mutual coupling caused by un-excited elements and loading caused by cable connected to them were considered.
    针对圆形阵列中单元间相互耦合作用引起单元水平面方向图的畸变这一问题,分析了未激励单元的互耦作用以及这些单元端接电缆的加载作用对激励单元阵中方向图的影响。
  12. Electronic pin, used wire and cable, line Board, diodes, three pole
    电子脚,废电线电缆、线路板、二极管,三极
  13. We spray speckles at the fixed end of the model and around the cable pole in cable. Meanwhile, we get speckle images with effect of the load on the bridge model and use strain test apparatus to detect.
    实验中在模型固定端处、斜索索孔附近喷制散斑,在桥梁模型承载情况下采集散斑图,同时用应变仪检测。
  14. According to the guide type of the pole, the observation pole now used to monitor the ground settlement in Shanghai has two kinds of structure, i. e. cable guide and guide wheel.
    目前监测上海市地面沉降的观测标按照标杆导正方式进行划分,主要有两种结构即钢丝绳导正式和导轮扶正式。
  15. LBB 3316/10 CCS Extension Cable 10m 10 m (32.8 ft), 7-pole male and female DIN connectors Extension cables for cont
    简述:延长电缆(10米)(CCS800) LBB3316/05和LBB3316/10延长电缆为适应较大场地的应用要求,准备了2种延长电缆:5m(197英寸)的 LBB3316/05和10m(394英寸)的LBB3316/10,两端分别接7芯DIN接头阴,阳
  16. LBB 3316/05 CCS Extension Cable 5m 5 m (16.4 ft), 7-pole male and female DIN connectors Extension cables for contrib
    简述:延长电缆(5米)(CCS800) LBB3316/05和LBB3316/10延长电缆为适应较大场地的应用要求,准备了2种延长电缆:5m(197英寸)的 LBB3316/05和10m(394英寸)的LBB3316/10,两端分别接7芯DIN接头阴,阳
  17. On the one hand, distribution circuit is changing from overhead power line to cable line, it lead to reduce electromagnetism pollution, avoid the contravention between pole and tree, add the greenbelt of the city, and beautify the environment.
    尤其在城市,一方面,电网正逐渐由架空线换为电缆,使其减少电磁污染和避免杆树矛盾,增加城市绿地,美化环境。
  18. The protection of pole-changing motors of the power cable wiredrawing machine
    电力电缆拉线机的变极电机的保护控制
  19. A T - shaped pole used for hanging up freshly printed sheets of paper to dry. Wipe the probe end and cable with an absorbent cloth and leave the probe to dry completely.
    T形杆一种用来将新复印纸张晾干的T形杆用吸水纸擦拭滩头末端和导线,并自然晾干。
  20. Study on Design of Erecting Cable System of Super-high Reinforced Concrete Pole
    特高钢筋混凝土电杆整立的系吊绳系的设计研究

cable pole 单语例句

  1. A man surnamed Wen was killed in a fall on Thursday when the pole he scaled in order to steal cable broke.
  2. Tram services were disrupted for about two hours because the power cable pole was between two tracks.

cable pole

中文翻译
1
电缆(分线)杆
相关单词
cable pole

相关单词辨析

这组词都有“电报”的意思,其区别是:
cable: 通常指通过海底电缆打的电报,也可指广义的电报。
telegraph: 侧重指通信方式和电报业各,不可数名词,表想象概念。
telegram: 常用词,指通过电报系统发出的信息,尤指具体的一份份电报。