bearing post是什么意思 bearing post在线中文翻译

bearing post

bearing post 双语例句

  1. The problem which involves the O-ring seal leakage is said to be serious as it could cause damage to the wheel bearing and eventually post danger to the drivers while on the road.
    这个问题所涉及的O型圈密封泄漏是说是严重的,因为它可能造成损害的车轮轴承,并最终后的危险司机,而在道路上。
  2. Prestressed concrete pipe piles by post-tensioning method are widely used in harbor engineering because of its high flexural bearing capacity and low cost.
    后张法预应力混凝土大管桩由于抗弯承载力高和成本低等诸多优点,在港口工程中得到了广泛的使用。
  3. Since the Dabie orogenic belt was affected meanwhile by the delamination of post collision of Indo-Chinese epoch and the subduction toward EuraAsia continent of Izanagi plate, the upwelling of asthenosphere material supplied a lot thermal energy for crust, isobathythem ascented, this made middle and lower crust amphibolite and granulite facies metamorphic and large-scale free water-bearing system and large area migmatites and granites were formed.
    在大别造山带印支期碰撞后所产生的拆沉作用和伊佐奈崎板块向欧亚板块的NWW向俯冲作用的共同影响下,软流圈物质上涌,为地壳输送大量的热能,等温面上升,使中下地壳发生角闪岩相或麻粒岩相变质作用和大规模含自由水体系的熔融,形成了大面积混合岩和花岗岩。
  4. The treating depth of soft soil can be the same as the driving depth of band drains, the post-construction settlement can be reduced to the maximum extent, the bearing capacity of foundation can be improved dramatically and the construction period can be shortened rapidly.
    软基加固处理深度能达到排水板打插的深度,最大程度减少工后沉降和极大提高地基承载力,具有明显缩短工期的优势。
  5. Therefore damage constitutive relationship must be combined into the finite element method formulations. Based on the assumption of isotropic elastoplastic damage, together with mixed hardening rule, an update Lagrange finite element formulation is deduced, and the steps of computation is presented. The formulae deduced can be used for low-cycle fatigue, post buckling behavior and bearing capacity of structures.
    基于弹塑性各向同性损伤的假定,对损伤有效应力的表达式进行了推演变换,在更新的Lagrange格式的虚功方程的基础上,推导出了考虑材料损伤和混合强化本构模型的非线性有限元基本方程,并给出了求解的方法和具体步骤,所得结论适用于分析结构的低周疲劳、曲屈后行为以及结构极限承载力等。
  6. The design includes determination of size and details of twin post piers and footing, internal force calculation, bending rebar of pier capping beam, shear rebar and stirrup, compression bar for piers and footings. Check of bearing capacity of piers and piles, crack opening, lateral displacement of pier, and eccentricity, were also conducted.
    设计主要内容:双柱式桥墩及基础细部尺寸拟定;内力计算,墩盖梁抗弯钢筋、抗剪钢筋和箍筋的配置及墩身和桩基抗压钢筋的配置;墩与桩承载能力检算、裂缝宽度检算、墩顶水平位移检算,偏心距检算。
  7. Based on the high resolution multi channel seismic data in the study area, this paper discusses the key techniques in respects of seismic imaging and post-stack inversion for identification of gas hydrate. The seismic reflection signatures of gas hydrate-bearing strata are defined and the lithologic parameter closely related with gas hydrate, i. e. acoustic velocity, is identified. The seismic reflectance signatures and abnormal velocity field provide both qualitative and quantitative geophysical evidences for identification of gas hydrate. According to the distribution of velocity field, it is inferred that the gas hydrate is mainly distributed in the overlying sedimentary strata near BSR in the study area.
    文章以南海北部陆坡区的多道高分辨率地震数据为基础,探讨了天然气水合物地震识别的地震成像和波阻抗反演这二个方面的关键技术;研究结果不但突出了含天然气水合物地层的地震反射特征,而且得到与天然气水合物最相关的地层岩性参数-声波速度;地震反射特征与速度场异常分别为天然气水合物的识别提供了定性和定量的地球物理证据;根据声波速度场的分布,可以推断存在于研究区地层的天然气水合物主要分布在靠近BSR的上覆沉积地层中。
  8. In this paper, some seismic attributes that include seismic waveform classification, spectral decomposition, 3D visual, and AVO characteristics were extracted from pre-stack and post-stack seismic data that include far, near offset and full offset stacked seismic data. By integrating above information, the question of heterogeneity was solved to a certain extent and the reservoir and gas-bearing were predicated. At last, the pitfalls which occur in the application of seismic attribute are summarized.
    利用保真处理的三维地震数据体,进行叠前及叠后地震资料的地震属性、波形分类、频谱分解处理和三维可视化、AVO远近道对比研究,并综合上述研究成果进行岩性与含气砂体的横向预测,较好地解决了有效储层分布及含气有利区块分布的非均质性问题,同时指出了研究过程中使用地震属性时应注意的问题。
  9. The quartz eclogite occurred in the southern part of the UHPM belt is characterized by coesite-free and glaucophane-bearing. The peak eclogite facies mineral assembledge is Grt+Omp+Ky+Qtz+Phe ±Zo+Rt, its metamorphic P-T condition is 635±40℃, 22±4Kb, while the pre-eclogite metamorphism and post-eclogite metamorphism are similar to that of the coesite-bearing eclogite.
    超高压变质带南侧的石英榴辉岩以不含柯石英而含蓝闪石为特征,其峰期榴辉岩相变质矿物组合为Grt+Omp+Ky+Qtz+Phe±Zo+Rt,变质的温度压力为635±40℃,22±4Kb,也经过与柯石英榴辉岩相似的榴辉岩相前绿帘—角闪岩相变质作用和峰期之后的角闪岩相及绿片岩相退化变质作用。
  10. Connecting rod bearing φ25 methods, there are three commonly used: connection, mortise and post-I welding.
    25支承杆的连接方法,常用的有三种:丝扣连接、榫接和剖口焊接。
  11. Near post 47km there is a high dip angle fault stretching from the lower part of the upper crust to the top of the crust_mantle transitional zone. This strike_slip fault has a direct bearing on the occurrence of the Jiashi strong earthquake swarm and is an inferred causative fault for the swarm (1997) according to this study.
    剖面47km桩号附近,上地壳下部至壳幔过渡带以上地壳范围内存在一条高倾角的深断裂,具有走滑性质,本研究认为该深断裂与1997年伽师强震群的发生密切相关,推断它为伽师强震群的发震构造。
  12. This paper opens out the economy foundation and theory base of post-contract obligations and responsibilities, starting from the research on legislation, prejudication and doctrine, basing on written information, by the method of materialistic dialectic, comparative analysis, concluding, deducting, systematic research and so on. This paper indicates that post-contract obligation is different from pre-contract obligation, contract obligation and is a unattached responsibility form of contract law; post-contract responsibility has its own definite constitution; This paper also illuminates the burden bearing methods of post-contract responsibility.
    本论文主要以立法、判例、学理研究为基础展开,以书面资料研究为主,通过运用唯物辩证法、比较分析、归纳法、演绎法、体系化研究等方法全面研究后合同义务与责任体系,揭示后合同义务与责任产生的经济基础与理论基础;论文提出了后合同义务是独立于先合同义务、合同义务的新型法定义务,后合同责任也是合同法中一独立的责任形式;后合同责任有确定的责任构成要件;后合同责任的承担方式。
  13. Study of post combustion ratio of fume during the heating of oil bearing scrap
    含油废钢加热过程中烟气二次燃烧率的研究
  14. Analysis on the Mechanism of Post-grouting Pile to Improve the Bearing Capacity of Bored Piles
    桩端后压浆对提高钻孔灌注桩承载力的作用机理分析
  15. Test research on bearing capacity character of post-grouting piles in loess area
    黄土地区后压浆钻孔灌注桩承载力特性试验研究
  16. Test on Bearing Behavior of Long and Large Socketed Pile Pile-base Post-grouting
    桩底后压浆的长大嵌岩桩承载性能试验
  17. The pile-end post-grouting technology can help to improve the bearing capacity of drilled grouting piles and to decrease their sedimentation.
    桩端后注浆可以提高钻孔灌注桩的承载能力,减少其沉降量。
  18. Furthermore, the test results also show that mud protection makes the bearing of the piles decrease, and the bearing of pile can be improved by post-grouting.
    试验也表明:泥浆护壁的成孔方式对桩体的承载性能有一定削弱作用,通过后注浆的工艺可得到改善。
  19. Secondly, the author analyses the mechanism that the post-grouting increases the bearing capacity of the bore pile.
    其次,从分析影响桩基承载力的因素出发,对后压浆的作用机理进行探讨。
  20. The pile-end post-grouting technology can increase the bearing capacity of piles and improve the bearing performance of piles.
    桩端后压浆可以提高桩的承载力,改善桩的承载性状。

bearing post

中文翻译
1
支承柱
相关单词
bearing post

相关单词辨析

graduate: 大学毕业生
undergraduate: 大学本科生
post graduate: 研究生

这组词都有“邮件,邮寄”的意思,其区别是:
mail: 主要用于美国。
post: 主要用于英国。

这组词都有“职位”的意思,其区别是:
position: 侧重指社会地位较高,工作较为庄重,领取工资的职位。
post: 普通用词,指人的职务,职位,岗位。
place: 指任何不分高低贵贱的职位;有时侧重指在政府、法庭所谋求的职位。
situation: 正式用词,一般指雇员或为富有人家工作所担任的职位,现多见于广告中。