fixed budget是什么意思 fixed budget在线中文翻译

fixed budget

fixed budget 双语例句

  1. Fixed quantity/plan cost investigating and determining a price: The extremely familiar mold workshop casts the ramming mold the cost accounting, to casts the workshop to cast the product and the punching department ramming product cost accounting; Outside (2) familiar operation punching department some need galvanization product sends the galvanization the flow and makes the request processing the flow; (3) end of the month organizes and supervises the mold/to cast/the punching department stocktaking, and compares with the SAP system in goods in stock, the verification goods in stock storehouse amount on deposit, discovers the difference reason, the request production workshop gives the detailed explanation, and reports the goods in stock the management level; 4 supervises the factory expense the rationality, compared with the factory expense and the budget difference, and carries on the comparative analysis explanation to the difference; (5) checks the material use factor regularly, traces the reason to some use factor change quite big material which and analyzes causes truly, and to the production workshop proposed the rationality suggested, and requests the workshop implementation; (6) end of the month carries on the expense to the service department mold product to compile, and carries on through the self-made half-finished product storehouse to the mold expense shares monthly; (7) end of the month establishes the cost computation chart with produces the report form (8) establishment ratio of margin report form which sells saves, and changes the big product to the ratio of margin to carry on the analysis, and gives the true reasonable explanation to it; (9) each year's end makes the cost budget, and so on each department coordinates the communication with the sales/purchase/workshop/transportation to supervise each department to give the next year the departmental budget, enables its to be possible to complete the cost material labor cost the budget; (1) promptly maintains product standard cost (2) in the SAP system promptly to maintain the supplier price in the SAP system, the track material price difference, writes up the analysis report
    工作描述及业绩:作为现公司财务的成本管理会计主要工作及业绩为:(1)定额/计划成本的核价:非常熟悉模具车间注塑冲压模具的成本核算,对注塑车间的注塑产品和冲压车间的冲压产品的成本核算;(2)熟悉操作冲压车间一些需要电镀的产品外发电镀的流程和做委托加工的流程;(3)月末组织并监督模具/注塑/冲压车间的存货盘点,并与SAP系统里的存货比较,审核存货库存额,找出差异原因,要求生产车间给予详细解释,并将存货上报管理层;(4)监督制造费用的合理性,比较制造费用与预算的差异,并对差异进行比较分析说明;(5)定期核对材料利用率,对一些利用率变化比较大的材料追踪并分析真正导致的原因,并向生产车间提出合理性建议,并要求车间实施;(6)月末对辅助车间模具产品进行费用汇总,并通过自制半成品库对模具的费用进行按月分摊;(7)月末编制成本计算表与产销存的报表(8)编制毛利率报表,并对毛利率变化大的产品进行分析,并对其给出真正的合理的解释;(9)每年末做成本预算表,与销售/采购/车间/运输等各个部门协调沟通督促各个部门给出下一年度的部门预算,使其可以做好成本料工费的预算; SAP方面:(1)及时在SAP系统中维护产品标准成本(2)及时在SAP系统中维护供应商价格,跟踪材料价格差异,出具分析报告;(3)协助财务主管进行财务分析
  2. It is establishes in the budget fixed quantity foundation, budgets the fixed quantity synthesis expansion.
    它是在预算定额基础上编制,较预算定额综合扩大。
  3. The budgetary estimate fixed quantity is the determination certain measuring unit expands the branch sub-item project the man-power, the material and the machinery consumption quantity standard. it is establishes in the budget fixed quantity foundation, budgets the fixed quantity synthesis expansion. is the establishment expands the preliminary design budgetary estimate, the control project investment basis.
    概算定额是确定一定计量单位扩大分部分项工程的人工、材料和机械消耗数量的标准。它是在预算定额基础上编制,较预算定额综合扩大。是编制扩大初步设计概算,控制八年级物理教学论文投资的依据。
  4. Prepare and file ledges.4, Reconciliation from time to time, find out the reasons for differences, handle adjustments while in closing.5, Control expenses within budget, manage in intercomany, AR, AP, fixed assents, intangible assets, tax, expenses and depreciations.6, Accomplish monthly or annually tax application and auditing in time.
    登记保管各种明细账、总分类账。4,定期对账,如发现差异,查明差异原因,处理结账时有关的账务的调整事宜。5,具体执行资金预算及控制预算内的经费支出,管理往来账、应收应付款、固定资产、无形资产,每月计提核算税金、费用、折旧等费用项目。6,做好税收筹划和具体实施,按时完成月度,年度税务申报和年审工作。
  5. Construction budget is designed units after the completion of the construction design of construction plans in accordance with the existing budget or valuation of fixed form, fixed costs, as well as areas of labor, materials, machinery, equipment and other budget preparation and to determine the price of construction and installation project cost of technical and economic document, it should control the budget identified in the design of cost.
    摘 要:施工图预算是又设计单位在施工图设计完成后名根据施工图、现行预算定额或估价表、费用定额以及地区人工、材料、机械、设备等预算价格编制和确定的建筑安装工程造价的技术经济文件,它应控制在设计概算确定的造价之内。
  6. By the combination between the qualitative and quantitative analysis in the interval estimation model, the synthetical expansion coefficient for the road budget qwota is determined, Xinjiang highway maintenance budget quota in the embankment project of comprehensive study for the expansion coefficient, and the Xinjiang highway maintenance budget of integrated fixed interval for the expansion coefficient (1.299, 1.502) are also studied, The development of the human range of uncertainty brought about by error is reduced.
    通过区间估计模型将定性与定量分析相结合,确定公路预算定额的综合扩大系数区间,以新疆公路养护预算定额中路基工程人工综合扩大系数为研究对象,最后确定新疆公路养护预算定额人工综合扩大系数的区间为(1.299,1.502),降低了人为制定区间的不确定性所带来的误差,并从理论与实践的角度对区间的科学性进行了论证,为公路定额的基础理论研究提供了科学依据。
  7. Finally consider these factors in the Composite, BOQ proceeds planning and mergers, after finishing sub-item inspection at the fixed price for the preparation of budget estimates.
    最后在综合考虑以上因素,对工程量清单进项规划及合并,整理后分项查阅价格定额进行概预算的编制。
  8. Fixed transfer budget update with season expectation news when no multiple expectations to choose.
    修正了只有一个赛季目标新闻里,和实际转会预算同步更新的问题。
  9. The most important cost-control system is fixed management system, the budget management system, the cost of the system of pre-trial report.
    成本控制中最重要的制度是定额管理制度、预算管理制度、费用审报制度等。
  10. On inventories, fixed assets management, inventory, ensure that the accounts are true.. December 2003 and participate in the preparation of the 2004 budget. Independent completed a management fee, manufacturing costs, product cost and the budget revision.
    月库存盘点,固定资产管理,盘点工作,确保帐实相符。。2003年12月参与公司2004年预算的编制工作,独立完成了管理费用、制造费用、产品成本的预算编制和修订工作。
  11. Discretionary fixed costs arise from periodic budget decisions that reflect top management policies.
    酌量性固定成本是根据一定时期的预算决策确定的成本。这种预算决策反映着最高管理层的策略。
  12. Project Cost graduates mainly in construction, installation, construction of municipal projects, such as budget and project billing and accounts, project audit and valuation, fixed the preparation and management; also engaged in industrial and civil engineering construction and organizational management, engineering supervision, project bidding and project management work.
    工程造价专业毕业生主要从事建筑、安装、市政等施工阶段工程预算及工程结算与决算,工程审计与估价,定额编制与管理;还可从事工业与民用建筑工程的施工和组织管理、工程监理、工程招投标及项目管理等方面的工作。
  13. The project construction cost specialized graduate mainly is engaged in construction stage project budget and the project settlement and the final accounts and so on the construction, installment, municipal administration, the project audit and the estimate, the fixed quantity establishment and the management; Also may be engaged in the industry and the civil construction project construction and the organization manages, project overseeing, the project incurs aspect and so on bid and project management work.
    工程造价专业毕业生主要从事建筑、安装、市政等施工阶段工程预算及工程结算与决算,工程审计与估价,定额编制与管理;还可从事工业与民用建筑工程的施工和组织管理、工程监理、工程招投标及项目管理等方面的工作。工程造价英文论文下载若图片无法显示或论文不完整,请
  14. Assist Fixed asset Budget control and rolling forecast maintenance.
    协助编制资产滚动预算及资产预算控制
  15. So the national highway construction, follow each fixed preparation principle, timely preparation of budget norm estimates and supplementary quota, is necessary.
    因此结合全国各区公路建设实际,遵循定额的编制原则,及时编制各区的补充预算定额和概算定额,十分必要。
  16. Budget: the total investment is 141, 220, 000 RMB, of which the fixed assets in investment is 137, 720, 000 RMB.
    各建设项目和资金核算,投资总数为14122万元人民币。
  17. Based on the budget setting process, the enterprise budget can be divided into imposed budget and participative budget, which both have its own virtue and deficiencies. The business can choose the appropriate method, complied with such factors as its own operation character, market environment, and target level of budget. According to budget preparative method, the enterprise budget can also be divided into fixed budget, flexible budget, probabilistic budget, rolling budget, and zero-based budget, etc.
    根据预算编制的程序企业预算可分为参与性预算和强加性预算,两种方式的预算各有优缺点,企业应根据自身生产经营特点、所处的市场环境、预算的目标层次等各方面因素来选择适合于自己的方式;根据预算编制的方法,企业预算分为固定预算、弹性预算、概率预算、滚动预算、零基预算等。
  18. Most are in much sounder financial shape than eight years ago. Over value d fixed exchange rates have been abandoned, banking systems overhauled, short-term foreign debt cut drastically and, in most cases, tighter budget disciplines imposed.
    多数亚洲国家的财务状况都比8年前健康得多,高估的固定汇率已被抛弃,银行系统进行了改革,短期外债大幅减少,而且多数国家都实行了更严格的预算纪律。
  19. Most are in much sounder financial shape than eight years ago. Overvalued fixed exchange rates have been abandoned, banking systems overhauled, short-term foreign debt cut drastically and, in most cases, tighter budget disciplines imposed.
    多数亚洲国家的财务状况都比8年前健康得多,高估的固定汇率已被抛弃,银行系统进行了改革,短期外债大幅减少,而且多数国家都实行了更严格的预算纪律。
  20. When creating a budget to manage your money you should begin by writing down all of your fixed monthly expenses.
    当创建一个预算管理你的钱你从一开始就应该写下来所有的每月固定开支。

fixed budget

中文翻译
1
固定预算
相关单词
fixed budget